Kwei Tang
Allison & Nancy Schleicher Chair Emeritus
Professor Emeritus
Quantitative Methods
Education
Ph.D., Management Science, Purdue University
M.S., Applied Statistics, Bowling Green State University
B.S., Management Science, National Chiao Tung University
Journal Articles
- Kwei Tang (2022). "On Academic Life: Opportunities, Innovation, and Satisfaction." Journal of Management and Business Research (in Chinese) vol. 39 (3), 265-287.
- Wu, C. C., Y. L. Chen, and K., Tang (2019). "Cost-Sensitive Decision Tree with Multiple Resource Constraints." Applied Intelligence vol. 49 (10), 3765-3782.
- Fang, Y.H., K. Tang, Chia-Ying Li, and Chia-Chi Wu (2018). "On Electronic Word-of-Mouth Diffusion in Social Networks: Curiosity and Influence." International Journal of Advertising vol. 37 (3), 360-384.
- Chen, Y.L., C.C. Wu, and K. Tang (2016). "Time-constrained Cost Sensitive Decision Tree Induction." Information Sciences vol. 354 140-152.
- Fang, Y.H. and K. Tang (2016). "Involuntary migration in cyberspaces: The case of MSN messenger discontinuation." Telematics and Informatics vol. 34 (1), 177-193.
- Yan, X., H. Zhao, and K. Tang (2015). "Requirement or Promise? An Analysis of the First-Mover Advantage in Quality Contracting." Production and Operations Management vol. 24 (6), 917-933.
- Chen, Y. L., K. Tang, C. C. Wu, J. Y. Jheng (2014). "Predicting the Influence of Users’ Posted Information for eWOM Advertising in Social Networks." Electronic Commerce Research and Applications vol. 13 431-439.
- Kao, H. P. and K. Tang (2014). "Cost-Sensitive Decision Tree Induction with Label-Dependent Late Constraints." INFORMS Journal of Computing vol. 26 (2), 238-252.
- Hu, H. W., Y. L. Chen, and K. Tang (2013). "A Novel Decision Tree Method for Structured Continuous-label Classification." IEEE Transactions on Systems, Man, and Cybernetics vol. PP (99), 1-13.
- Tarakci, H., K. Tang, and S. Teyarachakul (2013). "Learning and Forgetting Effects on Maintenance Outsourcing." IIE Transactions vol. 45 449-463.
- Huang, P. and K. Tang (2012). "A Constructive Periodicity Bound for the Unbounded Knapsack Problem." Operations Research Letters vol. 40 (5), 329-331.
- Chen, Y. L., Chia-Chi Wu, K. Tang (2009). "Building a Cost-constrained Decision Tree with Multiple Condition Attributes." Information Sciences vol. 179 (7), 967-979.
- Tseng, F.S., K. Tang, Moskowitz, and R. Plante (2009). "Maintenance Outsourcing Contracts with Options for New Technology Adoptions." IEEE Transactions on Engineering Management vol. 56 (2), 203-218.
- Chen, Y. L., Y. H. Hu, and K. Tang (2009). "Sequential Pattern Mining in Business-to-business (B2B) Environment." Information Sciences vol. 35 (6), 677-694.
- Chen, Y. L., Mi-Hao Kuo, Shin-Yi Wu, and K. Tang (2009). "Discovering Recency, Frequency, and Monetary (RFM) Sequential Patterns from Customers’ Purchasing Data." Electronic Commerce Research and Applications vol. 8 241-251.
- Tarakci, H., K. Tang, and S. Teyarachakul (2009). "Learning Effects on Maintenance Outsourcing." European Journal of Operational Research vol. 192 138–150.
- Chen, Y. L., H. W. Hu, and K. Tang (2009). "Constructing a decision tree from data with hierarchical class labels." Expert Systems with Applications vol. 36 4838–4847.
- Hu, H. W., Y. L. Chen, K. Tang (2009). "A Dynamic Discretization Approach for Constructing a Decision Tree with Continuous Labels." IEEE Transactions on Knowledge and Data Engineering vol. 21 (11), 1505-1514.
- Zhou, Z., Li, Y., and K. Tang (2009). "Dynamic pricing and warranty policies for products with fixed lifetime." Eurpoean Journal of Operational Research vol. 196 (3), 940-948.
- Kim, I., H. Moskowitz, R. Plante, H.L. Seo, and K. Tang (2008). "The Learning Curve: Knowledge Acquisition and Its Depreciation Revisited." International Journal of Operations and Quantitative Management vol. 13 77-94.
- Tang, K., Chen, Y.L., and H.W. Hu (2008). "Context-based Market Basket Analysis in a Multiple Store Environment." Decision Support Systems vol. 45 (1), 150-163.
- Tarakci, H., K. Tang, H. Moskowitz, and R. Plante (2006). "Incentive Maintenance Contracts for Channel Coordination and Improvement." IIE Transactions vol. 38 (8), 619-632.
- Tarakci, H., K. Tang, H. Moskowitz, and R. Plante (2006). "Maintenance Outsourcing of Multi-process Manufacturing Systems with Multiple Contractors." IIE Transactions vol. 38 (1), 67-78.
- Chen, Y.L., K. Tang, R.J. Shen, and Y.H. Hu (2005). "Market Basket Analysis in a Multiple Store Environment." Decision Support Systems vol. 40 (2), 339-354.
- Chen, Y., & Tang, K. (2005). "Finding The K-Th Shortest Path in a Time-schedule Network." Naval Research Logistics vol. 52 (1), 93-102.
- Tang, K., Gong, L., & Chang, D. (2003). "Optimal Process Control Policies Under a Time-Varying Cost Structure." European Journal of Operational Research vol. 149 197-210.
- Chen, Y., Shaio, L., & Tang, K (2003). "Time Analysis for Planning a Path in a Time-Window Network." Journal of Operational Research Society vol. 54 (8), 860-870.
- Ding, J., Gong, L., & Tang, K. (2002). "Effect of Test Equipment Uncertainty on Product Testing Decisions." Production and Operations Management vol. 11 (2), 125-138.
- Tang, K. and J. Tang, (2002). "Optimal Time-Based Pricing and Leadtime Policies for a Build-to-order Manufacturer." Production and Operations Management vol. 11 (3), 374-392.
- Roan, J., Gong, L., & Tang, K. (2000). "Joint Determination of Process Mean, Production Run Size and Raw Material Order Quantity." International Journal of Production Economics vol. 63 (3), 303-317.
- Williams, W., Tang, K., & Gong, L. (2000). "Process Improvement for a Container-Filling Process with Random Shifts." International Journal of Production Economics vol. 66 (1), 23-31.
- Chang, D., Tang, K., & Lai, C. (2000). "Sensor-Based On-Line Screening Procedure and Tool Replacement Policy." International Journal of Management Theory and Practices vol. 1 (1), 65-78.
- Chen, Y., Rinks, D., & Tang, K. (2000). "The First K Minimum Cost Paths in a Time-Schedule Network." Journal of Operational Research Society vol. 52 (1), 102-108.
- Tang, K., Williams, W., Jwo, W., & Gong, L. (1999). "Performance Comparison Between On-line Sensors and Control Charts in Manufacturing Process Monitoring." IIE Transactions vol. 31 (12), 1181-1190.
- Chun, Y., & Tang, K. (1999). "Cost Analysis of Two-Attribute Warranty Policies Based on the Product Usage Rate." IEEE Transactions on Engineering Management vol. 46 (2), 201-209.
- Gong, L., Roan, J., & Tang, K. (1998). "Process Mean Determination with Quantity Discounts in Raw Material Cost." Decision Sciences vol. 29 (1), 269-300.
- Chen, Y., & Tang, K. (1998). "Minimum-Time Paths in Mixed-Nodes Time-Schedule Networks." Computers and Operations Research vol. 25 (10), 793-805.
- Tang, J., Tang, K., & Moskowitz, H. (1997). "Bayesian Estimation of System Reliability from Component Test Data." Naval Research Logistics vol. 44 (1), 127-146.
- Liao, T., & Tang, K. (1997). "Automated Extraction of Welds from Digitized Radiographic Images Based on MlP Neural Networks." Applied Artificial Intelligence vol. 11 197-218.
- Chen, Y., & Tang, K. (1997). "Shortest Paths in Time-Schedule Networks." International Journal of Operations and Quantitative Management vol. 3 (3), 157-173.
- Chen, Y., Rinks, D., & Tang, K. (1997). "Critical Paths in an Activity Network with Time Constraints." European Journal of Operational Research vol. 100 122-133.
- Gong, L., Pruett, J., & Tang, K. (1997). "A Markovian Model for Process Setup and Improvement." Naval Research Logistics vol. 44 383-400.
- Gong, L., Jwo, W., & Tang, K. (1997). "Using On-line Sensors in Statistical Process Control." Management Science vol. 43 (7), 1017-1029.
- Gong, L., & Tang, K. (1997). "Monitoring Machine Operations Using On-line Sensors." European Journal of Operational Research vol. 96 479-492.
- Roan, J., Gong, L., & Tang, K. (1997). "Process Mean Determination under Constant Material Supply." European Journal of Operational Research vol. 99 (2), 353-365.
- Chun, Y., & Tang, K. (1995). "Determining the Optimal Warranty Price in the Free-Replacement, Fixed-Period Warranty Policy." European Journal of Operational Research vol. 85 (1), 579-593.
- Tang, J., Tang, K., & Moskowitz, H. (1994). "Bayesian Confidence Intervals for Reliability of Series Systems with Highly Reliable Components." IEEE Transactions on Reliability vol. 43 (1), 132-137.
- Tang, K., & Tang, J. (1994). "Design of Screening Procedures: A Review." Journal of Quality Technology vol. 26 (3), 209-226.
- Kim, C., Tang, K., & Peters, M. (1994). "A Two-Stage Procedure for Three-Class Screening." European Journal of Operational Research vol. 79 431-442.
- Tang, K., & Lo, J. (1993). "Determination of the Optimal Process Mean when Inspection is Based on a Correlated Variable." IIE Transactions vol. 25 (3), 66-72.
- Tang, J., & Tang, K. (1993). "A Note on Parallel Equipment Replacement." Naval Research Logistics vol. 40 569-573.
- Chen, Y., & Tang, K. (1992). "A Pictorial Approach to Poor-Quality Cost Management." Transactions on Engineering Management vol. 39 (2), 149-157.
- Moskowitz, H., & Tang, K. (1992). "Bayesian Variables Acceptance Sampling Plans: Quadratic Loss Function and Step-loss Function." Technometrics vol. 34 (3), 340-347.
- Chou, K., & Tang, K. (1992). "Burn-in Time and Estimation of Change-point with Weibull-exponential Distribution." Decision Sciences vol. 23 (3), 973-990.
- Schneider, H., Lin, B., & Tang, K. (1992). "Renewal Function Estimation with Censored Data in a Warranty Analysis." Journal of Statistical Computation and Simulation vol. 42 125-135.
- Tang, K. (1991). "Design of Multi-stage Screening Procedures for a Serial Production System." European Journal of Operational Research vol. 52 (3), 280-290.
- Park, J., Peters, M., & Tang, K. (1991). "Optimal Inspection Policy in Sequential Screening." Management Science vol. 37 (8), 1058-1061.
- Schneider, H., Tang, K., & O'Cinneide, C. (1990). "Optimal Control of a Production Process Subject to Random Deterioration." Operations Research vol. 38 (6), 1116-1122.
- Tang, K. (1990). "Design of Product Grading Procedures." Decision Sciences vol. 21 (2), 434-445.
- Lo, Y., & Tang, K. (1990). "Economic Design of Multi-characteristic Models for a Three-class Screening Procedure." International Journal of Production Research vol. 28 (12), 2341-2351.
- Ringuest, J., & Tang, K. (1990). "Empirical Comparisons of Five Procedures for Combining or Selecting Forecasts." Socio-Economic Planning Sciences vol. 23 (4), 217-225.
- Tang, K., & Schneider, H. (1990). "Cost Effectiveness of Using a Correlated Variable in a Complete Inspection Plan when Inspection Error is Present." Naval Research Logistics vol. 37 893-904.
- Harper, R., Strawser, J., & Tang, K. (1990). "Establishing Investigation Thresholds for Preliminary Analytical Procedures." Journal of Practice and Theory vol. 9 (3), 115-133.
- Schneider, H., & Tang, K. (1990). "Adaptive Procedures for the Two-stage Group Testing Problem Based on Prior Distributions and Costs." Technometrics vol. 32 (4), 397-405.
- Tang, K., & Tang, J. (1989). "Design of Product Specifications for Multi-characteristic Inspection." Management Science vol. 35 (6), 743-756.
- Tang, J., & Tang, K. (1989). "A Two-sided Screening Procedure Using Several Correlated Variables." IIE Transactions vol. 21 (4), 333-336.
- Tang, K., & Schneider, H. (1988). "Selection of The Optimal Inspection Precision Level for a Complete Inspection Plan." Journal of Quality Technology vol. 20 (3), 153-156.
- Schneider, H., O'Cinneide, C., & Tang, K. (1988). "Optimal Control of a Production Process Subject to AOQL Constraint." Naval Research Logistics vol. 35 383-395.
- Tang, K. (1988). "An Economic Model for Vendor Selection." Journal of Quality Technology vol. 20 (2), 81-89.
- Tang, K. (1988). "Economic Design of Product Specifications for a Complete Inspection Plan." Journal of Production Research vol. 26 (2), 203-217.
- Peters, M., Schneider, H., & Tang, K. (1988). "Joint Determination of Optimal Inventory and Quality Control Policy." Management Science vol. 34 (8), 991-1004.
- Tang, K. (1988). "Design of a Two-stage Screening Procedure Using a Correlated Variable." Naval Research Logistics vol. 35 (5), 513-533.
- Tang, K. (1988). "Economic Design of a Two-sided Screening Procedure Using a Correlated Variable." Applied Statistics vol. 37 (2), 231-241.
- Tang, K., Peters, M., & Tang, J. (1987). "Constructing and Maintaining a Beta Process Distribution for Bayesian Quality Audit Systems." IIE Transactions vol. 19 (1), 98-106.
- Crosby, M., Plante, R., & Tang, K. (1987). "An Economic Modeling Approach for the Determination of Materiality in Auditing." Decision Sciences vol. 18 (1), 108-115.
- Tang, K., Plante, R., & Moskowitz, H. (1987). "Stepwise Inspection in Bayesian Multiattribute Acceptance Sampling." Naval Research Logistics Quarterly vol. 34 (4), 469-486.
- Tang, K., Tang, J., & Moskowitz, H. (1987). "Estimating Low Process Average by Inverse Binomial Sampling." International Journal of Production Research vol. 25 (1), 57-69.
- Tang, K., & Schneider, H. (1987). "The Economic Effects of Inspection Error on a Complete Inspection Plan." IIE Transactions vol. 19 (4), 421-428.
- Tang, K. (1987). "Economic Design of a One-sided Screening Procedure Using a Correlated Variable." Technometrics vol. 29 (4), 477-485.
- Ringuest, J., & Tang, K. (1987). "Simple Rules for Combining Forecasts: Some Empirical Results." Socio-Economic Planning Sciences vol. 21 (4), 239-243.
- Tang, K., Plante, R., & Moskowitz, H. (1986). "Multiattribute Bayesian Acceptance Sampling Plans under Nondestructive Inspection." Management Science vol. 32 (6), 739-750.
- Moskowitz, H., Plante, R., & Tang, K. (1986). "Multiattribute Acceptance Sampling in Serial Production Systems." IIE Transactions vol. 18 (2), 130-137.
- Chand, S., & Tang, K. (1985). "A Comparison of Average and Discounted Cost Models for The Dynamic Lot Size Inventory Problem." European Journal of Operational Research vol. 22 (1), 9-18.
- Moskowitz, H., Plante, R., Tang, K., & Ravindran, A. (1984). "Multiattribute Bayesian Acceptance Sampling Plans for Screening and Scrapping Rejected Lots." IIE Transactions vol. 16 (2), 185-192.
Book Chapters
- Liu, J., Tang, K., & Chun, Y. (1997). "Container-Filling Problem under Capacity Constraints." Kluwer 215-229.
- Tang, K., & Pruett, J. (1994). "Manufacturing Process Quality Control and Improvement." Wiley & Sons 649-671.
- Tang, K. (1992). "Inspection Systems." Wiley & Sons 583-608.